Mini Brush Dustpan Set Making Injection Molding Machine

Product Details
Customization: Available
After-sales Service: We Have
Warranty: 18 Months
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (22)
  • Mini Brush Dustpan Set Making Injection Molding Machine
  • Mini Brush Dustpan Set Making Injection Molding Machine
  • Mini Brush Dustpan Set Making Injection Molding Machine
  • Mini Brush Dustpan Set Making Injection Molding Machine
  • Mini Brush Dustpan Set Making Injection Molding Machine
Find Similar Products
  • Overview
  • Overview
  • Product Parameters
  • Machine Details
  • Application Example
  • Why Choose UP Machines
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
UP-230
Structure
Horizontal
Plastic Type
Thermoplastic
Plasticizing Way
Screw Type
Clamping Way
Hydraulic
Automation
Automatic
Computerized
Computerized
Certification
CE, ISO9001:2008
Machine Weight
6.3t
Heating Power
14.2kw
Tank Volume
380L
System Pressure
16MPa
Transport Package
Film Packing
Specification
5.8*1.55*2.15
Trademark
UP
Origin
China
HS Code
8474809090
Production Capacity
500

Product Description

Overview

Mini Brush Dustpan Set Making Injection Molding Machine

Product Parameters

Mini Brush Dustpan Set Making Injection Molding Machine

MACHINE MODEL   UP-230S
International Size Rating   810/230
INJECTION UNIT   A B  
Screw Diameter mm 50 55 60
Length/Diameter Ratio L/D 22 20 18.3
Theoretical Shot Volume cm 461 558 664
Injection Weight(PS) g 415 502 598
Injection Rate(PS) g/s 153 189 228
Plasticizing Capacity g/s 24.6 32 39.8
Theoretical injection Pressure Mpa 177 146 23
Maximum Screw Speed rmp 0-200
Clamping Unit    
Clamp Tonnage kN 2300
Toggle Stroke mm 490
Space Between lie Bars mm 530X530
Max. Mold Height mm 560
Min.Mold Height mm 220
Daylight Opening mm 1050
Ejector Number Piece 5
Ejector stroke mm 140
Ejector tonnage kN 70
OTHErS    
System Pressure Mpa 16
Pump moter Power (servo) kW 23
Heater Power kw 14.2
Machine Dimension(LxWxH) mm 5.8X1.55X215
Oil tank Capacity L 350
Machine Weight t 6.3

Machine Details


Mini Brush Dustpan Set Making Injection Molding MachineMini Brush Dustpan Set Making Injection Molding MachineMini Brush Dustpan Set Making Injection Molding Machine

Application Example

Mini Brush Dustpan Set Making Injection Molding Machine

Why Choose UP Machines

Mini Brush Dustpan Set Making Injection Molding Machine

Mini Brush Dustpan Set Making Injection Molding MachineMini Brush Dustpan Set Making Injection Molding MachineMini Brush Dustpan Set Making Injection Molding MachineMini Brush Dustpan Set Making Injection Molding Machine

Packaging & Shipping

 

Mini Brush Dustpan Set Making Injection Molding Machine

FAQ

Mini Brush Dustpan Set Making Injection Molding Machine

Q1: Where is your factory located?
A1: Ningbo Union Power Machinery co., ltd which is located at No. 6006, Tongtu West Road, Haishu District, Ningbo City, Zhejiang Province.
Distance 2 hours by train from Shanghai city, 2hour by air from Guangzhou city.
 
Q2: Are you an integrated supplier for injection molding machine, mold, robot and auxiliary?
A2: Yes, we can provide the one-stop solution complete line according to customer's requirement.
 
Q3: How about the quality control in your factory?
A3: Union Power has the SOP (Standard Operation Procedure) and all the production step must follow up this SOP. Every machine needs at least automatic running over 72 hours and must be inspected carefully before shipment.
.
Q4: What is the delivery time of the machine?
A4: Actually, the delivery time is depended on the machine model size.
Normally, the delivery time as below list:
7-10 working days after received deposit. (100ton -530ton)
30-40 working days after received deposit. (620ton-750ton)
60-75 working days after received deposit. (800ton-1280ton)
75-90 working days after received deposit. (800ton-1280ton)
 
Q5 : What is the warranty of the machine ?
A5: Union Power machine main steel part is guaranteed for 3 years,and the electrical part 1 years, but worker's wrong operation is not included. We will prepare some spare part for the easy wearing parts.
 
Q6; How to install the machine and use the machine?
A6: Union Power will send you installation video and guide file. Also if you want, We can send engineer to your factory for worker training and machine installation.
 
Q7:I want to make a plastic product, but I don't know how to choose a suitable machine model, what should I do?
A7: Please feel free to tell us about the product detail information, such as size and weight, how many output you prefer per hour. We will help you to make good proposal with discount price.
Mini Brush Dustpan Set Making Injection Molding Machine

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier